If you are considering a resin bound driveway, one of the most common questions we get at Initial Driveway Installations is: "How long will my home be a construction zone?"

The short answer is that the resin surfacing itself is incredibly fast, but the total project time depends entirely on what is happening beneath the surface. Since we started in 2018, we’ve perfected a process that balances speed with the technical precision required for our ten-year guarantee.

Here is a realistic timeline for a professional resin bound installation in Wythall.

Phase 1: The Preparation (2 – 4 Days)

The preparation is the most time-consuming part, but it is also the most important. A resin driveway is only as good as its base.

  • Excavation: We remove your old driveway and dig down to the required depth.

  • Sub-Base: We install and compact a high-quality MOT Type 1 or Type 3 stone base.

  • Edge Restraints: We install your block paved borders or brick walling. These must be set in concrete and allowed to dry before the resin can be poured.

  • Base Course: If we are installing a new permeable base, we lay a layer of porous asphalt or concrete.

Note: If you already have a perfect, solid tarmac or concrete base in good condition, we may be able to skip straight to Phase 2, saving you significant time.

Phase 2: The Resin Pour (1 Day)

This is where the magic happens. On "Pour Day," our team works with a specialized forced-action mixer to blend the aggregate and UV-stable resin.

  • Mixing & Laying: For a standard-sized driveway (approx. 50–70m²), the actual laying process usually takes one full working day.

  • Precision: We use spirit levels and measuring tools throughout the day to ensure a perfectly smooth, seamless finish.

Phase 3: The Curing Process (The "Waiting" Game)

Once the resin is laid, it needs time to chemically bond and harden (cure).

  • Foot Traffic: Usually safe to walk on after 6 to 12 hours.

  • Vehicle Traffic: You must wait at least 24 to 48 hours before parking a car on it. In colder weather, we recommend waiting the full 48 hours to be safe.

Factors That Can Change the Timeline

  1. The Weather: This is the big one. Resin cannot be laid in the rain or in very high humidity. Even a light drizzle can cause the resin to foam and fail. If the clouds look grey over Wythall, we may delay the pour by 24 hours to protect your investment.

  2. Driveway Size: Larger projects (over 100m²) may require two days of pouring to ensure a perfect, "wet-edge" finish without joins.

  3. Complexity: If your project involves intricate walling or multiple steps, expect the prep phase to lean toward the 4-day mark.

The Initial Driveway Installations Promise

We know having your driveway out of action is an inconvenience. That’s why we provide a clear schedule on our quote forms before we start. We detail the driveway size and break down the costs for the driveway and walls so there are no surprises—just a professional, efficient transformation.

Ready to start your timeline? Contact Patrick at our Wythall office to book your survey. We’ll use the Resin Mill visualiser to pick your colours and get your project moving.

Comments


Get In Touch with Initial Driveway Installations

facebook-reviews.png

Mail: initialdrivewayinstallations@gmail.com
Office: 0121 667 9162

Mobile: 07380 198472

Wythall Birmingham South 

Unknown-1.jpeg
  • Facebook
tobermore-registered_orig.jpg
Unknown-1.png
Unknown-2.png
Unknown-3.jpeg
maxresdefault.jpg
Unknown-3.png

Driveway installers Wythall | Resin bound driveways Warwickshire | Block paving Tamworth | Patio installers Redditch | Driveway contractors Bromsgrove | Resin driveways Derbyshire

Unknown.png
google-reviews-logo-smaller.png
IMG_4602.PNG
Unknown_edited_edited.jpg
bottom of page